Thank you for inviting Your Company to bid on your kitchen remodel. This proposal sets out the work by trade, the allowances for your selections, what's excluded, three options to choose from, the schedule, and how payments and changes work.
[Describe the project, for example: a remodel of the 180 square foot kitchen at the address above, with new cabinets, quartz countertops, flooring, and lighting.] Our price is based on the walkthrough and measurements we took on site, and on the selections described below.
For the Full remodel option, the work includes:
The Refresh option keeps the existing cabinet boxes and layout. The layout change option removes the wall to the dining room, with an engineered beam, and moves the sink to a new island.
Allowances are budgets for items you'll choose during the project. For the Full remodel option they are:
If a selection costs more than its allowance, we'll show you the difference in a change order before ordering, billed at cost plus 10%. If it costs less, the full difference is credited to you.
Unless added in writing, our price doesn't include:
Choose the option that fits your kitchen and budget. Each price includes labor, materials, permits, and cleanup, with allowances for your selections.
New counters, backsplash, fixtures, and paint, keeping the existing cabinets and layout
| Description | Units | Unit Price | Total Price | |
|---|---|---|---|---|
|
Floor and room protection |
1 | $850.00 | $850.00 | |
|
Countertop and backsplash removal |
1 | $1,200.00 | $1,200.00 | |
|
Cabinet painting and new hardware |
1 | $6,800.00 | $6,800.00 | |
|
Countertop allowance (quartz, installed) |
1 | $7,500.00 | $7,500.00 | |
|
Backsplash tile allowance (materials) |
1 | $900.00 | $900.00 | |
|
Backsplash tile installation (sq ft) |
45 | $28.00 | $1,260.00 | |
|
Fixture allowance (sink, faucet, pendants) |
1 | $2,200.00 | $2,200.00 | |
|
Plumbing fixture setting |
1 | $950.00 | $950.00 | |
|
Pendant lighting circuit |
1 | $1,100.00 | $1,100.00 | |
|
Paint, walls and ceiling |
1 | $1,900.00 | $1,900.00 | |
|
Permit and inspection |
1 | $450.00 | $450.00 | |
|
Cleanup and haul-off |
1 | $650.00 | $650.00 | |
|
Project management and supervision |
1 | $2,240.00 | $2,240.00 | |
| Total | USD $28,000.00 | |||
New cabinets, counters, flooring, and lighting in the existing layout
| Description | Units | Unit Price | Total Price | |
|---|---|---|---|---|
|
Preparation and demolition |
1 | $4,050.00 | $4,050.00 | |
|
Framing and drywall |
1 | $3,500.00 | $3,500.00 | |
|
Electrical with eight recessed lights |
1 | $6,280.00 | $6,280.00 | |
|
Plumbing rough-in and fixture setting |
1 | $3,600.00 | $3,600.00 | |
|
Cabinet allowance (supply) |
1 | $18,000.00 | $18,000.00 | |
|
Cabinet installation and hardware |
1 | $3,400.00 | $3,400.00 | |
|
Countertop allowance (quartz, installed) |
1 | $7,500.00 | $7,500.00 | |
|
Backsplash tile (allowance and installation) |
1 | $2,160.00 | $2,160.00 | |
|
Luxury vinyl plank flooring |
1 | $2,420.00 | $2,420.00 | |
|
Fixture allowance (sink, faucet, pendants) |
1 | $2,200.00 | $2,200.00 | |
|
Paint, walls and ceiling |
1 | $1,900.00 | $1,900.00 | |
|
Appliance installation |
1 | $650.00 | $650.00 | |
|
Building permit and inspections |
1 | $1,200.00 | $1,200.00 | |
|
Dumpster and final cleanup |
1 | $1,350.00 | $1,350.00 | |
|
Project management and supervision |
1 | $4,290.00 | $4,290.00 | |
| Total | USD $62,500.00 | |||
The full remodel, plus an opened wall and a new island with the sink
| Description | Units | Unit Price | Total Price | |
|---|---|---|---|---|
|
Preparation and demolition |
1 | $4,900.00 | $4,900.00 | |
|
Wall removal with engineered beam |
1 | $6,800.00 | $6,800.00 | |
|
Structural engineer's letter (allowance) |
1 | $900.00 | $900.00 | |
|
Framing and drywall |
1 | $4,600.00 | $4,600.00 | |
|
Electrical with island circuits and recessed lights |
1 | $7,900.00 | $7,900.00 | |
|
Plumbing relocated to the island |
1 | $5,800.00 | $5,800.00 | |
|
Cabinet allowance (supply) |
1 | $22,000.00 | $22,000.00 | |
|
Cabinet and island installation |
1 | $4,200.00 | $4,200.00 | |
|
Countertop allowance (quartz, installed) |
1 | $9,800.00 | $9,800.00 | |
|
Backsplash tile (allowance and installation) |
1 | $2,160.00 | $2,160.00 | |
|
Luxury vinyl plank flooring |
1 | $3,100.00 | $3,100.00 | |
|
Fixture allowance (sink, faucet, pendants) |
1 | $2,200.00 | $2,200.00 | |
|
Paint, walls and ceiling |
1 | $2,200.00 | $2,200.00 | |
|
Appliance installation |
1 | $650.00 | $650.00 | |
|
Building permit and inspections |
1 | $1,800.00 | $1,800.00 | |
|
Dumpster and final cleanup |
1 | $1,600.00 | $1,600.00 | |
|
Project management and supervision |
1 | $5,890.00 | $5,890.00 | |
| Total | USD $86,500.00 | |||
We can start within [three] weeks of permit approval. Once work begins, the Refresh option takes about three weeks, the Full remodel about six, and the layout change about eight. Cabinet and countertop lead times can move these dates, and we'll keep you updated as orders are confirmed.
We pull the building permit, schedule every inspection the work needs, and are on site for each one. The permit fee is included in your price.
Payments are tied to milestones, so you pay as the work is done. For the Full remodel option:
The other options follow the same percentages. Each draw is due within 7 days of its invoice.
Any change to the work, the price, or the schedule is made by a written change order that we both sign before the changed work begins. Allowance overages and credits are settled the same way.
We warrant our workmanship for one year from completion. If something we installed fails because of how it was installed, we'll repair it at no charge. Manufacturers' warranties on cabinets, fixtures, and materials pass through to you.
Your Company is a licensed contractor, license number [license number, for example: 1048233], and carries general liability and workers' compensation insurance. Certificates are available on request.
Choose an option and sign below to accept this proposal. We'll follow with a construction contract for your signature, and begin the permit application once it and the deposit are received.